CEB Press Fabrication Drawings
Intro
For standards, see Sample Fabrication Drawing and combine with OSE CAD Title Block standard. For fabrication instructions of individual parts of the CEB press see A-Z Instructionals.
Overall Procedure
To facilitate one-off replication by independent producers, it is useful to include procedural hints - which can save many hours of fabrication time - over simply showing the parts a,nd expecting the fabricator to build them. The point of rapid teaching is to facilitate replication - and this is a critical piece of the OSE platform.
Suggested Pages
- Cut list and instructions + BOM. May fit on one or more pages. Parts drawings included, possibly on separate pages
- Please include illustrations of how to torch and calculations for how many sheets of 1/8" sheet metal we need for the following parts: 100080 100079 100062 100092 100060 100061 100074
- Hole drilling/punching list and instructions
- Main cylinder - plates, welding
- Main cylinder - hydraulic fittings, extension instructions (extend to fit in frame) (may combine with last item)
- Frame assembly instructions - main frame, jig, drilling technique, cover plates, bolting and torques
- Frame assembly - main cylinder insertion
- Frame assembly - includes cylinder side and front adjusters, sensor attachment, drawer adjustments
- Part drawings: drawer adjusters, front/back adjuster plates, sensor holder.
- Assembly - arms, legs, feet, hopper interface
- Parts - arms, legs, feet, hopper interface
- Drawer - fabrication (IN PROCESS, BEDDINGFIELD (12/17/11))
- Drawer - roller guides, mounting the guides, and insertion into frame, adjustment up and down
- Hopper - fabrication, supports, assembly
- Grate - parts, fabrication, mounting
- Shaker motor - parts, fabrication, assembly, mounting (IN PROCESS, BEDDINGFIELD (12/17/11)
- Controller - box, controller, sensors - explosion drawing
- Controller box - parts, assembly, connections, mounting
- Sensor - parts, assembly, mounting on holders, connection - 2 cylinders
- Solenoids - parts, assembly, mounting, wiring
- Hydraulics - explosion
- Hydraulics - main cylinder, secondary cylinder (bypass+flow control), solenoid from power cube, solenoid to active elements, shaker (with needle valve)
- Machine integration - mechanical function description, hydraulics wiring procedure, electric wiring procedure including battery connection, connection of machine to power, pressure settings, initial testing, software
Pages Submitted for Approval
Media:100076 SHAKER ASSEMBLY AND SUB COMPONENTS (10 PAGES).pdf
Media:100026 DRAWER ASSEMBLY (5 PAGES).PDF
File:01-001-00-0 CEB Main Assembly.zip
Back to Table of Contents