Catarina Log

From Open Source Ecology
Jump to: navigation, search

Contents


Sat Mar 9, 2024

  • Hours Log for Cabinet Work - February:
  • Feb 1: 2 hours
  • Feb 3: 2:45 hours
  • Feb 4: 0:30 hours
  • Feb 5: 3:15 hours
  • Feb 6: 2 hours
  • Feb 7: 2:15 hours
  • Feb 8: 1:15 hours
  • Feb 9: 0:45 hours
  • Feb 10: 3 hours
  • Feb 13: 1:45 hours
  • Feb 20: 2:45 hours
  • Feb 24: 3 hours
  • Feb 25: 1:15 hours

Tue Feb 27, 2024

  • Parts Design - 24" insert oven: [1]
  • Design Guides - Kitchen (added info for insert oven, pp 31-35): [2]
  • Interior Assemblies - Base Cabinet - Insert Oven: [3]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (re-design of kitchen, laundry and bathrooms): [4]

Fri Feb 23, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (re-design of kitchen, laundry and bathrooms): [5]
  • Interior Assemblies - Countertop - with cutout for 24" undermount sink: [6]
  • Interior Assemblies - Support for 24" undermount sink: [7]

Tue Feb 20, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (re-design of kitchen, laundry and bathrooms): [8]
  • Interior Assemblies - Fridge Nook (revisions): [9]
  • Interior Assemblies - Laundry Closet v2 (revisions): [10]

Mon Feb 19, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (re-design of kitchen, laundry and bathrooms): [11]
  • Interior Assemblies - Fridge Nook: [12]

Sun Feb 18, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (re-design of kitchen, laundry and bathrooms): [13]
  • Flat Interior Wall Modules: [14]

Sat Feb 17, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (re-design of kitchen, laundry and bathrooms): [15]
  • Interior Assemblies - Laundry Closet v2: [16]

Fri Feb 16, 2024

  • Kitchen-Bath-Laundry Redesign (conceptual): [17]

Thu Feb 15, 2024

  • Conceptual Design Library: [18]
  • Kitchen-Bath-Laundry Redesign (conceptual): [19]

Wed Feb 14, 2024

  • Washer/Dryer: [20]
  • Laundry Design Guide: [21]
  • DOOR HANDLES
  • (2) sets of deadbolt + keyed handle for the garage and terrace exterior doors: [22]
  • (1) keyed handle for the front door: [23]
  • (5) privacy handles for the interior doors: [24]
  • (1) keyless deadbolt for front door: [25]

Tue Feb 6, 2024

  • Project Book : Maysville 1.3k 2022-23 : Interior Finishing : Trim (72 exterior door): [https://docs.google.com/presentation/d/1IG0h1-YtvI_8DNL18wsNl1l8-dHCW-N7cSPiU511IW8
  • Interior Assemblies - Custom Kitchen Cabinets - Open Shelving: [26]
  • Interior Assemblies - Custom Kitchen Cabinets - Above Sink / Water Heater: [27]
  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN (added open shelving and above sink cabinet drawings): [28]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to custom kitchen cabinets): [29]


Thu Feb 1, 2024

  • Project Book : Maysville 1.3k 2022-23 : Interior Finishing : Trim (36x42 windows, 36x60 windows, 36 exterior doors): [30]

Wed Jan 31, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to 2st stairwell light boxes, refrigerator module, stairwell trim): [31]
  • Project Book : Maysville 1.3k 2022-23 : Framing : Interior : Wall Modules (added 2nd story corridor modules, refrigerator module):[32]
  • Interior Wall Modules - Refrigerator Shield: [33]

Tue Jan 30, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to 1st stairwell beadboard, kitchen utility channel): [34]
  • Project Book : Maysville 1.3k 2022-23 : Interior Finishing : Wall Covering (added beadboard detail under stairs):[35]
  • 2D Drawings: Interior Finishing - Wall Covering (CAD): [36]

Mon Jan 29, 2024

  • Project Book : Maysville 1.3k 2022-23 : Framing : Interior : Layout (revisions):[37]
  • Project Book : Maysville 1.3k 2022-23 : Framing : Interior : Staircase : Landing:[38]
  • 2D Drawings: Framing : Layout (CAD): [39]
  • Interior assemblies - Staircase - Landing (revisions): [40]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to 1st stairwell landing): [41]


Sun Jan 28, 2024

  • Project Book : Maysville 1.3k 2022-23 : Framing : Interior : Layout:[42]
  • Project Book : Maysville 1.3k 2022-23 : Interior Finishing : Wall Covering:[43]
  • Project Book : Maysville 1.3k 2022-23 : Framing : Interior : Wall Modules:[44]
  • Project Book : Maysville 1.3k 2022-23 : Framing : Interior : Staircase:[45]
  • 2D Drawings: Interior Finishing - Wall Covering (CAD): [46]
  • 2D Drawings: Framing : Interior Wall Modules (CAD): [47]

Sat Jan 27, 2024

  • 2D Drawings: Interior framing layout - 1st story - bath-kitchen-laundry: [48]
  • 2D Drawings: Interior framing layout - 1st story - stairwell: [49]
  • 2D Drawings: Interior framing layout - 2nd story - bath: [50]
  • 2D Drawings: Interior framing layout - 2nd story - stairwell: [51]
  • 2D Drawings: Interior framing layout - 2nd story - corridor: [52]
  • 2D Drawings: Interior framing layout - 2nd story - bedrooms: [53]

Fri Jan 26, 2024

  • 2D Drawings: Interior framing layout - 1st story - bath-kitchen-laundry: [54]
  • 2D Drawings: Interior framing layout - 1st story - stairwell: [55]

Thu Jan 25, 2024

  • Interior Assemblies - Staircase Landing (revisions to framing and flooring): [56]
  • BoM - Flooring (revisions to landing flooring): [57]
  • BoM - Interior Trim (revisions to landing edge trim): [58]
  • Project Book : Maysville 1.3k 2022-23 : Interior Finishing : Paint & Stain Lists (added materials for staircase landing): [59]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to 1st stairwell landing): [60]
  • Project Book : Maysville 1.3k 2022-23 : Framing : Interior : Staircase:[61]
  • Inventory of bathroom and kitchen materials
  • Exterior Wall Modules with Nailing Boards (CAD): [62]
  • Exterior Wall Modules with Nailing Boards (Tech Drawings): [63]

Wed Jan 24, 2024

  • Interior Wall Modules - 1st story: [64]
  • Interior Wall Modules - 2nd story: [65]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to 2nd story stairwell: framing, beadboard): [66]

Tue Jan 23, 2024

  • Interior Assemblies - Staircase Landing: [67]
  • Interior Wall Modules - 1st staircase side wall with pony: [68]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to 1st stairwell: framing, beadboard, drywall, landing): [69]


Sat Jan 20, 2024

  • Maysville MO - 1.3k - 2022-23 - BoM - Kitchen (revisions to cabinet spacers): [70]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to garage trim): [71]
  • Project Book : Maysville 1.3k 2022-23 : Interior Finishing : Paint & Stain Lists: [72]

Tue Jan 16, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (added bottom beadboard behind kitchen cabinets, corrected gap in bathroom bottom beadboard, revisions to refrigerator wall): [73]
  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN: [74]
  • How to Build - Wood Finishing: [75]

Sun Jan 14, 2024

  • Interior Assemblies - Staircase - Notched Riser (revisions): [76]
  • Interior Assemblies - Staircase - Stringer: [77]
  • Interior Assemblies - Staircase 40.75 (revisions): [78]
  • Structural Assemblies - Floor 16x44 (revisions): [79]
  • Structural Assemblies - Floor 16x44 - Subfloor (revisions): [80]
  • Parts design - Flooring - T-Molding: [81]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to staircase, understairs closet, subfloor and flooring): [82]

Sat Jan 13, 2024

  • Interior Assemblies - Staircase Landing (dimensions): [83]

Thu Jan 11, 2024

  • Parts design - 36" Base Sink Cabinet (added detail): [84]
  • Interior Assemblies - Cooktop Base Cabinet (revisions, added detail): [85]
  • Interior Assemblies - Cooktop Base Sink: [86]
  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN: [87]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (added details to kitchen): [88]

Wed Jan 10, 2024

  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN: [89]
  • How to Build - Wood Finishing: [90]
  • Interior Assemblies - 12" Kitchen Base Cabinet with Spacer: [91]
  • Cabinets: second coat of stain on base cabinets + prep of wall cabinets (label, remove doors) + work space organization

Tue Jan 9, 2024

  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN: [92]
  • How to Build - Wood Finishing: [93]
  • Cabinet Finishing: first coat of stain on all kitchen base cabinets (boxes, doors, drawers and 1 spacer) - 2 hours.

Mon Jan 8, 2024

  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN: [94]
  • Interior Assemblies - Cooktop Base Cabinet (revisions to spacers): [95]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (added revised cooktop base cabinet): [96]

Sun Jan 7, 2024

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (removed kitchen wall cabinet spacers): [97]
  • Interior Assemblies - Above Sink Kitchen cabinet (revisions to account for removal of spacers): [98]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim (revisions to remove wall spacers): [99]
  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN: [100]

Thu Jan 4, 2024

  • Project Book - Maysville MO - 1.3k - 2022-23 - TABLE OF CONTENTS: [101]
  • Project Book - Maysville MO - 1.3k - 2022-23 - KITCHEN: [102]

Sat Dec 23, 2023

  • Maysville MO - 1.3k - 2022-23 - BoM - Flooring: [103]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Framing: [104]
  • Maysville MO - 1.3k - 2022-23 - BoM - Kitchen: [105]
  • Maysville MO - 1.3k - 2022-23 - BoM - Bathrooms: [106]

Thu Dec 21, 2023

  • Material Guide - Flooring: [107]
  • Maysville MO - 1.3k - 2022-23 - BoM - Flooring: [108]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Framing: [109]
  • How to Build Guides - Flooring: [110]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (flooring detail + revisions to interior trim + revisions to kitchen cabinets): [111]

Wed Dec 20, 2023

  • Project Book - Maysville MO - 1.3k - 2022-23 - Table of Contents: [112]
  • Project Book - Maysville MO - 1.3k - 2022-23 - Interior Finishing-Fixtures-Kitchen: [113]
  • Parts Design - Kitchen Cabinets - 36 Base Sink Cabinet (revised to make it technically accurate): [114]
  • Parts Design - Kitchen Cabinets - 12 Base Single Cabinet (revised to make it technically accurate): [115]
  • Interior Assemblies - Kitchen Cabinets - Cooktop Base Cabinet (revised to make it technically accurate): [116]

Tue Dec 19, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (flooring detail + revisions to interior trim): [117]
  • How to Build Guides - Flooring: [118]
  • Maysville MO - 1.3k - 2022-23 - BoM - Flooring: [119]
  • Interior Assemblies - Joist Closures - Exterior Walls(revisions): [120]
  • Interior Assemblies - Joist Closures - Interior Walls (revisions): [121]

Mon Dec 18, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2nd story threshold cutouts + flooring detail + revisions to interior trim): [122]

Sun Dec 17, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (1st story threshold cutouts + flooring detail + revisions to interior trim): [123]

Thu Dec 14, 2023

  • Maysville MO - 1.3k - 2022-23 - BoM - Bathrooms (revisions): [124]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim (revisions to bathroom trim): [125]
  • Interior Assemblies - Bathroom Vanity 49 (revisions to materials): [126]
  • Interior Assemblies - Bathroom Vanity 61 (revisions to materials): [127]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to bathroom + started flooring w/ adjustments to trim): [128]

Tue Dec 12, 2023

  • Maysville MO - 1.3k - 2022-23 - BoM - Kitchen (finalized): [129]

Sun Dec 10, 2023

  • Parts Design - Kitchen Cabinets - 30x30 wall cabinet (revisions): [130]
  • Parts Design - Kitchen Cabinets - 15x30 wall cabinet (revisions): [131]
  • Interior Assemblies - Kitchen Cabinets - Above Cooktop with Insert Range Hood (revisions): [132]
  • Maysville MO - 1.3k - 2022-23 - BoM - Kitchen (new list of materials after design revisions): [133]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [134]

Sat Dec 09, 2023

  • Parts Design - Insert Range Hood (revisions): [135]
  • Interior Assemblies - Range Hood Mounting Frame: [136]
  • Interior Assemblies - Kitchen Cabinets - Above Cooktop with Insert Range Hood (added technically correct range hood): [137]

Wed Dec 6, 2023

  • Parts Design - Kitchen Cabinets - 30x30 wall cabinet: [138]
  • Parts Design - Insert Range Hood (firegas 30in): [139]

Tue Dec 5, 2023

  • Interior Wall Modules - Cooktop Shield: [140]
  • Interior Assemblies - Kitchen Cabinets - Above Cooktop with Insert Range Hood (revisions): [141]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim (added 3/8" trim for fridge corner): [142]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen: added cooktop shield, nailing board, revised trim): [143]

Mon Dec 4, 2023

  • Interior Assemblies - Kitchen Cabinets - Above Cooktop with Range Hood (insert): [144]
  • Interior Assemblies - Kitchen Cabinets - Cooktop Base Cabinet: [145]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [146]

Thu Nov 30, 2023

  • Interior Assemblies - Butcherblock Countertop with cutout for cooktop: [147]
  • Design Guides - Kitchen: [148]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [149]

Mon Nov 27, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [150]

Tue Nov 21, 2023

Price of wood pellets - Fall-Winter 2023

Tue Nov 14, 2023

  • Parts Design - Kitchen Sink (drop-in 33in): [151]
  • Interior Assemblies - Butcherblock Countertop with cutout for sink (drop-in, 33in): [152]
  • Interior Assemblies - Above Sink Cabinet (revisions): [153]
  • Documentation - Butcherblock Countertop with cutout for sink (drop-in, 33in) - dimensions (pdf): [154]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [155]
  • Maysville MO - 1.3k - 2022-23 - BoM - Kitchen (revisions): [156]

Sat Nov 11, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [157]
  • Maysville MO - 1.3k - 2022-23 - BoM - Kitchen (revisions): [158]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim (revisions): [159]

Fri Nov 10, 2023

  • Interior Assemblies - Above Cooktop Cabinet (with Insert Range Hood): [160]
  • Interior Assemblies - Above Cooktop Cabinet (with Under Cabinet Range Hood): [161]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [162]

Thu Nov 9, 2023

  • Design Guides - Kitchen: [163]
  • Parts Design - Butcherblock countertop with cutout for range: [164]
  • Parts Design - Kitchen Cabinets (wall-15x30): [165]
  • Parts design - Cabinet Doors (13x13): [166]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [167]

Wed Nov 8, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to kitchen): [168]
  • Interior Assemblies - Above Sink Cabinet (custom): [169]
  • Parts Design - Range Hood: [170]

Tue Nov 7, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (added detail to kitchen, revisions of cabinetry to accommodate larger fridge and stove): [171]
  • Design Guides - Kitchen: [172]
  • Interior Assemblies - Above Sink Cabinet (custom): [173]

Mon Nov 6, 2023

  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim (added existing stock to spreadsheet): [174]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim - Shopping List (on Menards account)
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (added detail to kitchen): [175]
  • Parts design - Cabinet Doors: [176]

Inventory of trim stock in the Maysville house:

BENCHMARKING
  • Kitchens of Homes for Sale in Maysville-MO Area: [177] [178] [179] [180] [181] [182] [183]
  • - Fridge: 4/7 have french-door fridge, 2/7 have freezer-on-top fridge, 1/7 has no appliances (but has space for oven and fridge)
  • - Oven: 6/7 has oven, 1/7 has no appliances (but has space for oven and fridge)
  • Kitchens of Homes for Sale in Savannah-MO Area: [184] [185] [186] [187] [188] [189] [190] [191] [192]
  • - Fridge: 6/9 have french-door fridge, 2/9 have freezer-on-top fridge, 1/9 does not show any fridge
  • - Oven: 9/9 have oven
  • Typical Fridge Dimensions: [193]

Wed Nov 1, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to garage interior trim): [194]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim: [195]
  • Inventory of trim stock in the workshop:

Return:

Keep:

Tue Oct 24, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to house interior trim): [196]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim: [197]

Sun Oct 22, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to house interior trim): [198]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim: [199]

Sat Oct 21, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to house interior trim): [200]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim: [201]

Thu Oct 19, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (garage beadboard blocking, revisions to garage interior trim): [202]
  • Designers - Garage Blocking: [203]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim: [204]

Wed Oct 18, 2023

  • Maysville MO - 1.3k - 2022-23 - Build Instructions - Beadboard: [205]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to interior trim): [206]
  • Maysville MO - 1.3k - 2022-23 - BoM - Interior Trim: [207]

Wed Oct 11, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (replaced ladders with nailing boards): [208]

Thu Oct 5, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (small adjustments to interior wall finishing details): [209]
  • Maysville MO - 1.3k - 2022-23 - Build Instructions - Beadboard: [210]

Thu Sep 28, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (small adjustments to interior wall finishing details): [211]
  • Maysville MO - 1.3k - 2022-23 - Build Instructions - Beadboard: [212]

Tue Sep 26, 2023

  • Maysville MO - 1.3k - 2022-23 - Build Instructions - Beadboard: [213]

Mon Sep 25, 2023

  • Maysville MO - 1.3k - 2022-23 - Build Instructions - Beadboard: [214]

Sun Sep 24, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (changes to understairs drywall): [215]
  • Maysville MO - 1.3k - 2022-23 - Build Instructions - Beadboard: [216]

Sat Aug 5, 2023

Update with vanity mirrors. [217]

Fri July 13, 2023

  • Interior Assemblies - Water Heater Custom Cabinet (changed finish of some parts from painted to stained): [218]
  • Interior Assemblies - Range Hood Custom Cabinet (changed finish of some parts from painted to stained): [219]
  • Interior Assemblies - In Between Wall Kitchen Cabinets (changed finish of some parts from painted to stained): [220]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (added bottom beadboard behind kitchen cabinets, chnaged finish of bathroom vanities and tub trim, changed finish of kitchen cabinets): [221] (NOTE: parts and trim colored brown on the model are meant to be made of solid pine, stained in special walnut and varnished)

Fri July 7, 2023

  • BoM - Interior Trim (folder): [222]
  • BoM - Interior Trim (spreadsheet): [223]
  • BoM - Interior Trim (CAD) - Walls, Ceiling and Doors: [224]
  • BoM - Interior Trim (CAD) - Windows 36x42: [225]
  • BoM - Interior Trim (CAD) - Windows 36x60: [226]
  • BoM - Interior Trim (CAD) - Front Door Interior Awning: [227]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (interior trim adjustments and labeling): [228]

Thu July 6, 2023

  • Interior Assemblies - 36x42 window trim (1st story): [229]
  • Interior Assemblies - 36x60 window trim (2nd story): [230]
  • Interior Assemblies - Staircase Landing (revisions): [231]
  • Interior Assemblies - 49" Bathroom Vanity (revisions): [232]
  • Interior Assemblies - 61" Bathroom Vanity (revisions): [233]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (removed wall at bottom landing, new landing detail, window trim, rest of interior trim): [234]

Wed July 5, 2023

  • Interior Wall Modules - Wall module w/ window opening + vent: [235]\
  • Interior Assemblies - Water Heater Cabinet (revisions): [236]
  • Interior Assemblies - In Between Wall Kitchen Cabinets (new): [237]
  • Interior Assemblies - Bathroom Vanities (added bottom): [238]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (revisions to landing wall - create window opening + vent detail; more interior trim detail; update water heater cabinet; bathroom vanities): [239]

Mon July 3, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st top plate, top trim, ceiling trim): [240]

Sun July 2, 2023

  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st stairwell + 2st corridor trim details + 2st bedroom trim): [241]

Sat July 1, 2023

  • Parts design - Staircases (notched riser + revised risers assembly): [242]
  • Parts design - Beadboard (beadboard parts for ceiling): [243]
  • Interior Assemblies - Ceiling (16x44 beadboard ceiling): [244]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st utility channel + trim + ceiling beadboard): [245]

Fri June 30, 2023

  • Parts design - Beadboard (beadboard with cutouts for 2st bedroom walls): [246]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st beadboard + utility channel): [247]

Thu June 29, 2023

  • Parts design - Beadboard (beadboard with cutouts for 2st bedroom walls): [248]
  • Wall Modules design - 13in module (beadboard with cutouts for 2st bedroom walls): [249]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st beadboard + utility channel + changes to 2st framing layout): [250]

Wed June 28, 2023

  • Parts design - Beadboard (beadboard with cutouts for 2st windows): [251]
  • Wall Modules design - Pony Walls (revisions of 2st stairwell walls): [252]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st beadboard + revisions on stairwell): [253]

Mon June 26, 2023

  • Parts design - Beadboard (beadboard with cutouts for 2st bedroom walls): [254]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st beadboard + framing revisions): [255]

Sun June 25, 2023

  • Parts design - Beadboard (2st beadboard for bathroom walls + cutout detail at top of staircase): [256]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (2st beadboard): [257]

Sat June 24, 2023

  • Interior assemblies - Cabinets (kitchen - above sink cabinet): [258]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (placement of 2st toilet, 1st joist cavity closures bathtub trim): [259]

Fri June 23, 2023

  • Interior assemblies - Doors (double door awning + interior trim assembly): [260]
  • Interior assemblies - Staircases (landing revisions): [261]
  • Interior wall Modules - Pony Walls (understairs pony wall revisions): [262]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (front door trim, utility channel, revisions to understairs closet, trim): [263]

Wed June 21, 2023

  • Construction Details Doc - [264]
  • Parts Design - Windows & Doors (exterior doors jamb and exterior casing): [265]
  • Maysville MO - 1.3k - 2022-23 - Full Assembly (1st story utility channel and trim): [266]

Tue June 20, 2023

  • Documentation - Interior Wall Modules Map - 2nd story - CAD (revisions to bathroom walls): [267]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (added 1.5" to 2st bath length, 1st story utility channel and trim): [268]

Mon June 19, 2023

  • Documentation - Interior Wall Modules Map - 2nd story - CAD (revisions to bathroom walls): [269]
  • Parts Design - Beadboard (bathroom door - 2nd story): [270]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (2nd story bathroom walls, utility channel): [271]

Sun June 18, 2023

  • Documentation - Interior Wall Modules Map - 1st story (CAD): [272]
  • Documentation - Interior Wall Modules Map - 2nd story (CAD): [273]
  • Documentation - Interior Wall Modules Map (Build Instructions): [274]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (1st story trim revisions, utility channel): [275]

Thu June 15, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (interior finishing detail: stairwell + living room; revisions to corridor and kitchen trim): [276]

Wed June 14, 2023

  • Parts design - Beadboard (interior badboard for under-stairs closet with groove for drywall): [277]
  • Interior Wall Modules design - Under-stairs closet door module: [278]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (under-stairs closet finishing detail): [279]

Tue June 13, 2023

  • Exterior Decorative Structures - Window Boxes (revisions): [280]
  • BoM - Exterior Decorative Structures - Window Boxes (revisions): [281]
  • Interior Assemblies - Under-stairs Closet Pony Wall: [282]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (under-stairs closet finishing detail, ceiling trim detail, 2nd story beadboard, window boxes): [283]

Mon June 12, 2023

  • Interior Assemblies - Staircase Landing (revisions): [284]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (framing, trim and beadboard detail around corridor, stairwell and under-stairs closet): [285]

Sat June 10, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (blocking for tub, under stairs closet interior, staircase details): [286]

Interior Assemblies - Staircase (revisions): [287]

Thu June 8, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (adjustments to kitchen details + interior trim): [288]

Wed June 7, 2023

  • Parts design - Trim (32 interior door, pre-hung,split jamb): [289]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (increased bathroom depth by 1.5", interior trim detail): [290]

Tue June 6, 2023

  • Interior Assemblies - Laundry Closet (front wall interior detail): [291]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (interior sheathing and trim detail: garage, bathroom, laundry, kitchen): [292]

Sun June 4, 2023

  • Parts design - Beadboard (garage wall triangles): [293]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (garage interior finishing): [294]

Sat June 3, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (garage interior finishing): [295]

Fri June 2, 2023

  • Dwelling-Garage Fire Separation: [296], [297], [298], [299]
  • Parts design - Beadboard (garage-house door): [300]
  • Parts design - Beadboard (ceiling): [301]
  • Structural Assemblies - Beadboard (garage ceiling): [302]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (garage interior finishing): [303]

Sat May 27, 2023

  • Interior Assemblies - Laundry Closet (redesign): [304]

Fri May 26, 2023

  • BoM - Exterior Decorative Structures - Window Boxes: [305]
  • Exterior Decorative Structures - Front Door Canopy (dimensions): [306]
  • Parts Design - Beadboard (bathroom door - corridor side): [307]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (interior finishing): [308]

Wed May 24, 2023

  • Exterior Decorative Structures - Front Door Deck (revisions + dimensions): [309]
  • Exterior Decorative Structures - Front Door Canopy (revisions + dimensions): [310]
  • BoM - Exterior Decorative Structures - Front Door Deck + Front Door Canopy: [311]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (revised canopy and deck): [312]

Mon May 22, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (bathroom interior finishing): [313]
  • Interior Assemblies - Joist Cavity Blocking: [314]

Sat May 20, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (bathroom interior finishing): [315]
  • Parts Design - Beadboard (bathroom door): [316]

Fri May 19, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (laundry closet, bathroom ceiling): [317]
  • Interior Assemblies - Laundry Closet (revisions): [318]
  • Parts Design - Beadboard (ceiling): [319]

Tue May 16, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (framing above 1st bath wall, laundry closet): [320]
  • Parts Design - Beadboard with cutouts (1st single door): [321]
  • Interior Assemblies - Laundry Closet (revisions): [322]

Mon May 15, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (1st story beadboard - tops, exterior walls): [323]
  • Parts Design - Beadboard with cutouts (1st windows + patio door): [324]

Fri May 12, 2023

  • Modules - Interior Wall Modules (new modules + revisions to blocking): [325]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (1st story wall framing, bathroom dimensions, 2st wall framing revisions): [326]

Thu May 11, 2023

  • Modules - Interior Wall Modules (new modules + revisions to blocking): [327]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (revisions and additions to 2st interior wall framing): [328]

Tue May 9, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (2st interior walls - module frames): [329]

Mon May 8, 2023

  • Rosebud3 - Stringer Generator: [330]
  • Rosebud3 - Stringer: [331]
  • Rosebud3 - Staircase: [332]
  • Rosebud3 - Staircase Dimensions: [333]
  • Rosebud3 - Staircase Landing (redesign): [334]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (staircase, landing): [335]
  • FreeCAD Module Designer (by MJ): [336]

Fri May 5, 2023

  • Rosebud3 - Interior Wall Modules (revisions to blocking): [337]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (interior wall blocking): [338]
  • Rosebud3 - Staircase Study: [339]
  • Rosebud3 - Stringer: [340]

Thu May 4, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (2st story wall modules and details, stairwell, ceiling, interior wall/ceiling trim, wall intersection tee): [341]
  • Rosebud3 - Interior Wall Modules (changed blocking and height on all wall modules + new braced pony wall module): [342]
  • Rosebud3 - Interior Wall Modules - Braced Pony Wall Module: [343]
  • Rosebud3 - 1.3k - Maysville22 - Roof Frame (adjustment to end joists): [344]

Mon May 1, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (front door foundation detail, front door canopy, front deck): [345]
  • Assemblies - Canopy (revisions): [346]
  • Assemblies - Front Door Deck (new): [347]

Thu Apr 13, 2023

Half Walls : Framing and Bracing

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (stairwell walls + finishing details): [348]

"By code, guard rails on residential stairs and balconies must be able to withstand a 200-pound sideload. Most jurisdictions also require them to be at least 36 inches above the nosing of the stairs or the finished floor of the balcony. The same rules apply to pony walls used for these purposes. The height is easy to check, but there’s no good way to test the side-load capacity of a guard. Carpenters just build them as strong as they can. or stair guards, the pony wall is usually built from the floor below using continuous studs. Where these studs touch the rough stringer, the two are joined with lags or structural screws, tying everything together in a rigid assembly. This works very well the closer you are to the top of the stair, but at the bottom, the wall again creates a lever that can overcome a simple stud-to-plate connection. Here is another place where the end stud should run down into the floor framing below. The ends of the balcony walls almost always wind up being braced by other walls. Sometimes that’s another pony wall if the balcony makes a turn. One end often ends where it meets the pony wall from the stair. These connections create all the strength needed for most residential situations." [349]

OPTIONS

  • If the half wall studs run parallel to floor joists below: Extend wall studs down into floor cavity and nail + glue them to floor joists below
  • If the half wall studs run perpendicular to floor joists below: Alight half wall with a joist and run plywood down the face of wall and overlapping the joist
  • Run threaded rods from top plate to floor frame below [350]
  • Use metakl braces: [351] or [352]

RESOURCES

Wed Apr 12, 2023

  • Rosebud3 - Build Instructions - Beadboard: [355]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (added beadboard, added trim, revisions to interior wall modules and finishing details)): [356]

Wed Apr 5, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (stairwell walls + finishing details): [357]
  • Rosebud3 - Interior Wall Modules (additional wall modules): [358]

Tue Mar 28, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (began stairwell walls + finishing details): [359]
  • Rosebud3 - Interior Wall Modules (Stairwell wall modules): [360]

Mon Mar 27, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (added 1st story interior wall modules): [361]
  • Rosebud3 - Interior Wall Modules: [362]

Wed Mar 22, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (j-channel detail, siding): [363]

Tue Mar 21, 2023

  • Assemblies - Trellis Band - Modules (revisions): [364]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (j-channel detail, revisions to trellis band, revisions to window trim): [365]

Windows

Tue Mar 14, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (j-channel detail, revisions to terrace trim, revisions to terrace door trim): [366]
  • Trim BoM (revisions): [367]
  • Parts Design - tapered 1x6 (revisions): [368]
  • Parts design - single door awning: [369]
  • Parts design - single door awning - dimensions: [370]

Mon Mar 13, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (roof runners detail, revisions to exterior trim): [371]
  • Parts Design - rail straps (positioning): Front and Back
  • Trim BoM (revisions): [372]

Thu Mar 9, 2023

  • Assemblies - Trellis Band - Modules (revisions): [373]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (trellis band revisions): [374]

Mon Mar 6, 2023

  • Assemblies - Trellis Band - Modules: [375]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (trellis band): [376]

Wed Mar 1, 2023

  • Parts Design - j-channel: [377]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (exterior trim detail, j-channel): [378]

Tue Feb 28, 2023

  • Parts Design - Drip Cap (updated): [379]
  • Parts Design - Drip Cap Corner (new): [380]
  • Parts Design - Termination Bar (updated): [381]
  • Assemblies - Roof Drip Cap Assembly: [382]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (exterior light boxes, roof edge detail)): [383]

Mon Feb 27, 2023

  • Rosebud3 - 20x20 Garage - Front Offset (revised terrace details): [384]
  • Parts Design - Cant Strip: [385]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (revisions to exterior trim and other garage/terrace details, exterior light boxes): [386]

Tue Feb 21, 2023

  • Parts Design - Window Boxes: [387]
  • Build Instructions - Window Box Dimensions: [388]
  • Parts Design - Tapered 1x4 Trim: [389]
  • Parts Design - Double Door Awning - 1x4: [390]
  • Parts Design - 3x5 window exterior trim assembly: [391]
  • Parts Design - 3x5 window exterior trim assembly - dimensions: [392]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (window boxes + updated front door awning): [393]

Mon Feb 20, 2023

  • Parts Design - Tapered 1x6: [394]
  • Parts Design - Double Door Awning - 1x6 (to correct for out of plumb front wall): [395]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (awning and front door trim detail): [396]

Tue Feb 7, 2023

  • Parts Design - Drip Cap: [397]
  • Parts Design - Termination Bar: [398]
  • Parts Design - EPDM 16x44 (revisions): [399]
  • Roof Assembly - Front Trim Risers (revisions): [400]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (additional detail on roof assembly): [401]

Fri Feb 3, 2023

  • Rosebud3 - 1.3k - Maysville22 - Full Assembly (added roof edge sheathing, EPDM, front risers): [402]
  • Rosebud3 - 1.3k - Maysville22 - Roof Trim Risers: [403]
  • Part Design - EPDM 16x44: [404]

Thu Feb 2, 2023

  • Rosebud3 - 1.3k - Maysville22 - Roof Decking: [405]
  • Rosebud3 - 1.3k - Maysville22 - Roof Tapers: [406]
  • Rosebud3 - 1.3k - Maysville22 - Roof Insulation Box: [407]
  • Rosebud3 - 1.3k - Maysville22 - Roof Insulation: [408]
  • Rosebud3 - 1.3k - Maysville22 - Full Assembly: [409]

Mon Jan 30, 2023

  • Parts Design - Corner Post: [410]
  • Rosebud3 - 1.3k - Maysville22 (added exterior trim detail to garage and house): [411]
  • Concord Vinyl Siding (used on Maysville house): Specs + Installation Guide

Fri Jan 27, 2023

  • Rosebud3 - 1.3k - Maysville22 - Decorative Trellis Assembly: [412]
  • Rosebud3 - Decorative Trellis Modules: [413]

Tue Dec 13, 2022

  • Rosebud3 - 2k - Savannah22 (technical assembly): [414]
  • Rosebud3 - 2k - Savannah22 - FOUNDATION FOLDER: [415]
  • Rosebud3 - 2k - Savannah22 - FOUNDATION DIMENSIONS (3D CAD): [416]
  • Rosebud3 - 2k - Savannah22 - FOUNDATION DIMENSIONS (PDF): [417]
  • Rosebud3 - 2k - Savannah22 - SILL PLATE (3D CAD): [418]
  • Rosebud3 - 2k - Savannah22 - SILL PLATE (PDF): [419]
  • Rosebud3 - 2k - Savannah22 - FOUNDATION MODULES MAP (3D CAD): [420]
  • Rosebud3 - 2k - Savannah22 - FOUNDATION MODULES MAP (PDF): [421]

Tue Dec 13, 2022

  • Rosebud3 - 2k - Savannah22 (technical assembly): [422]
  • Rosebud3 - 2k - Savannah22 (wall modules count): [423]
  • Rosebud3 - 2k - Savannah22 (sill plate): [424]
  • Rosebud3 - 1.3k - Maysville22 (sill plate): [425]
  • Rosebud3 - 32x32 Floor - Left Offset: [426]

Wed Dec 7, 2022

  • Rosebud3 - 1.3k - Maysville22 (technical assembly): [427]
  • Rosebud3 - 20x20 Garage - Front Offset (technical assembly): [428]
  • House Wall Modules (technical CAD): [429]
  • Garage Wall Modules (technical CAD): [430]

Mon Dec 5, 2022

  • Modules Map for Placement of Foundation Anchors: freeCAD, PDF
  • Portal Anchors Placement: freeCAD, PDF

Fri Dec 2, 2022

  • 16x44 Floor(3D CAD): [431]
  • Foundation for Rosebud3-1.3k-Maysville22: [432]

Thu Dec 1, 2022

  • Foundations (3D CAD): [433]
  • Garage (3D CAD): [434]
  • Revised Wall Modules: [435]
  • Rosebud3 2k Savannah22: [436]

Wed Nov 30, 2022

  • Rosebud3 1.3k - Maysville 22: [437] (garage technical 3D CAD)
  • Garage Wall Modules: [438]
  • Changes to door and window modules (remove jack stud, raise sill, make top uniform): [439]

Tue Nov 29, 2022

  • Rosebud3 1.3k - Maysville 22: [440] (garage technical 3D CAD)

Thu Nov 24, 2022

  • BoM's and Budgets - Exterior Trim: [441]

Wed Nov 23, 2022

  • BoM's and Budgets - Exterior Trim: [442]

Tue Nov 22, 2022

  • BoM's and Budgets - Windows and Doors: [443]

Mon Nov 21, 2022

  • Rosebud3 - 1.3k - Maysville2022: [444]

Sun Nov 20, 2022

  • Rosebud3 - 1.3k - conceptual model (design revisions): [445]
  • Rosebud3 - 1.3k - foundation: [446]
  • Rosebud3 - 1.3k - 20x20 garage - foundation: [447]
  • Rosebud3 - 1.3k - Maysville2022: [448]

Tue Nov 15, 2022

  • Rosebud 1.3k and 2k conceptual models (design revisions): [449]

Fri Nov 11, 2022

  • Rosebud 1.2k and 1.3k conceptual models: [450]
  • Siding calculations and orders for Rosebud 1.3k and 2k: [451]
  • Window sourcing
  • Materials orders (call stores, etc.)

Tue Nov 9, 2022

  • Rosebud 1.2k and 1.3k conceptual models: [452]

Mon Nov 7, 2022

  • Rosebud 1.2k and 1.3k conceptual models: [453]

Sun Nov 6, 2022

  • Rosebud 1.2k and 1.3k conceptual models: [454]

Fri Nov 4, 2022

Thu Nov 3, 2022

Wed Nov 2, 2022

  • Revisions to canopy on all conceptual models: [457]
  • Siding calculator: [458]

Tue Nov 1, 2022

  • Rosebud3 Conceptual (1k, 2k variants): [459]
  • Rosebud3-2K Conceptual (w/ 2-car garage): [460]

Mon Oct 31, 2022

Engineering notes and revisions: [461]

Sat Oct 29, 2022

Rosebud 3 2K conceptual models (white, grey, black, seed, 2k): [462]

Tue Oct 25, 2022

Rosebud 3 2K conceptual model: [463]

Sun Oct 23, 2022

Rosebud 3 2K conceptual model: [464]

Sat Oct 22, 2022

Rosebud 3 2K conceptual model: [465]

Fri Oct 21, 2022

Rosebud 3 2K conceptual model: [466]

Thu Oct 20, 2022

Rosebud 3 2K conceptual model: [467]

Wed Oct 19, 2022

Rosebud 3 2K conceptual model: [468]

Tue Oct 18, 2022

Mon Sep 19, 2022

  • Rosebud 3 conceptual expanded model: [469]
  • Butcher Block w/ cooktop cutout: [470]
  • Kitchen Build Instructions: [471]

Fri Sep 16, 2022

  • Butcher Block w/ sink cutout: [472]
  • Butcher Block assembly: [473]
  • Kitchen Build Instructions: [474]

Thu Sep 15, 2022

Wed Sep 14, 2022

  • Kitchen build instructions: [476]

Tue Sep 13, 2022

  • Revised kitchen cabinets: [477]
  • Revised kitchen: [478]
  • Kitchen build instructions: [479]

Tue Aug 16, 2022

Sat Aug 13, 2022

Wed Aug 10, 2022

Tue Aug 9, 2022

Mon Aug 8, 2022

Fri Aug 5, 2022

Thu Aug 4, 2022

Wed Aug 3, 2022

Mon Aug 1, 2022

  • Redesigned window modules for 2x6 headers and then reverted to 2x12 as it appeared to add up to the same weight (when taking into account added height of cripples + additional blocking)
  • Added info on framing openings to Walls Design Guide
  • Code only allows replacing of jack studs with header hangers where table R602.7(1) indicates only 1 jack stud is needed (see Walls Design Guide). Since this table only covers building widths of 12ft (1 jack stud required) and 24 ft (2 jack studs required) and our building width is 16 ft, it is not clear whether we can: 1) replace all jack studs with hangers or 2) use only 1 jack stud on each side and replace the second one with a hanger.
  • Revised assembly CAD [488] with tapered roof deign (instead of riser)

Sun July 24, 2022

Sat July 23, 2022

Thu July 21, 2022

Wed July 20, 2022

Sun July 17, 2022

Sat July 16, 2022

Tue July 12, 2022

Sun July 10, 2022

Sat July 9, 2022

Thu July 7, 2022

Wed July 6, 2022

Tue May 24, 2022

Wed May 18, 2022

Tue May 17, 2022

Sat May 14, 2022

Wed May 11, 2022

Tue May 3, 2022

Mon Apr 11, 2022

Mon Apr 4, 2022

Sat Apr 2, 2022

Thu Mar 31, 2022

Mon Mar 28, 2022

Kitchen Design Guide

Mon Mar 21, 2022

Thus Mar 10, 2022

Interior detail - bottom landing corner: [490]

Sun Mar 6, 2022

Staircase - calculations and details: [491]

Wed Mar 2, 2022

  • Utiity channel around openings (technical CAD): [492]

Mon Feb 28, 2022

  • Added interior blocking to all 1st story wall modules: [493]
  • Interior finishing details (beadboard, utility channel, trim): [494]

Sun Feb 27, 2022

Double door utility channel: [495]

Sat Feb 26, 2022

Doors and windows CAD: [496]

Tue Feb 22, 2022

Interior design scrapbook: [497]

Mon Feb 21, 2022

Interior trim design guide: [498]

Tue Feb 15, 2022

Wall modules technical design: Wall modules CAD Techincal Design Parts CAD

Sat Feb 12, 2022

Rosebud II - Front Door Canopy: Conceptual Technical Construction Details BoM

Thu Feb 10, 2022

Rosebud II - 18" Canopy: BoM New technical design

Mon Feb 7, 2022

Rosebud II - 18" Awning: Conceptual Technical Construction Details

Sun Feb 6, 2022

18" awning technical design: awning + attachment to wall + construction detail

Fri Feb 4, 2022

18" awning: [499]

Mon Jan 31, 2022

Awning attachment detail: [500]

Sun Jan 30, 2022

48" awning: [501]

Sat Jan 29, 2022

  • Mounting a mini split unit on vinyl siding: [502] [503]
  • Duct Covers:

3" 15ft kit - $50 3" 7.5 ft kit - $35

  • Advantage of dutch lap siding over clapboard: it provides a flat (ish) surface to attach things to (lights, outlets, electrical boxes, mini split unit, etc)
  • Rosebud awning conceptual design: [504]

Fri Jan 28, 2022

Senville - Mini Split Systems:

  • Can coil tubing as long as it's flat - to avoid oil traps. Coil should look like a spring, not a rollercoaster.
  • Tubing should be a minimum of 10 ft, preferably 11 ft.
  • P6 error code means overpressure
  • Perforations in dutch lap siding: [505] [506] [507] [508] [509]
  • Range hood vent on clapboard siding: [510]
  • Installing a j-channel after the siding is installed: [511]
  • Notching clapboard siding to install thimble (This Old House): [512]
  • Running electrical cables through siding: [513]
  • Power meter mounted on clapboard siding: [514]
  • How to install a flanged mounting block on pre-installed siding: [515] [516] [517] [518]
  • Flanged outdoor outlet mounting block and box combo: [519]
  • Simplest way to to install an outdoor GFCI outlet : [520] [521]
  • 1/2" lap siding surface mounting blocks:

Outlet Light Light Light All purpose All purpose Spigot/All purpose All purpose All purpose - Menards


Sun Jan 23, 2022

Exterior trim: [522]

Sun Jan 23, 2022

Sat Jan 22, 2022

  1. Rosebud Foundation 3D CAD: [525]
  2. Door opening at foundation detail: [526]

Fri Jan 21, 2022

  1. Rosebud Foundation 3D CAD: [527]

Thu Jan 20, 2022

  1. Rosebud Foundation (freeCAD model, work in progress): [528]
  2. Installing doors on an insulated slab: [529] [530]

Wed Jan 19, 2022

Rosebud Foundation Detail:

REFERENCES

Insulated foundation details: [531] [532] [533] [534]

Materials:

Tue Nov 9, 2021

Black cabins and cottages: [535] [536] [537] [538] [539] [540] [541] [542] [543] [544] [545] [546] [547] [548]

Sun Jul 11, 2021

FeF Cabins

Mon Jul 13, 2020

Pop-Up House Timelapse (helical pier foundation?)

Sun Mar 15, 2020

Catarina OSE Hours

Sun Feb 23, 2020

Belize microhouse: Roof installation instructions

Sat Feb 22, 2020

Belize microhouse: Roof installation instructions

Fri Feb 21, 2020

Belize microhouse: Materials management; Revised CAD; Instructionals (revised to account for irregular rough-sawn lumber

Thu Feb 20, 2020

Belize microhouse: Materials management; Revised CAD

Wed Feb 19, 2020

Belize microhouse: Truss build instructions; Revised CAD

Mon Feb 17, 2020

Belize microhouse: Revised CAD (small change to window frames to improve ease of build). Documentation and Instructionals

Fri Feb 14, 2020

Belize microhouse: Documentation and Instructionals

Wed Feb 12, 2020

Belize microhouse: Finalize CAD and BoM

Tue Feb 11, 2020

Belize microhouse: CAD and BoM

Sun Feb 9, 2020

Window and door modules documentation.

Sat Feb 8, 2020

Window and door modules technical design (CAD).

Tue Feb 4, 2020

Belize Microhouse Roof CAD. BoM.

Mon Feb 3, 2020

Belize Microhouse Roof CAD

Fri Jan 31, 2020

Belize Microhouse Roof Design

Thu Jan 30, 2020

Belize Microhouse trusses

Wed Jan 29, 2020

Belize Microhouse CAD, roof design, materials

Fri Oct 5, 2018

OSE Hours - [549]

Sun Oct 8, 2017

PV System Log. 3D Printer Workshop Competitive Audit.

Mon Nov 16, 2015

Rabbitry.

Sun, Oct 25, 2015

Chicken House / Vermicompost

Sun, Aug 23, 2015

Growing potatoes in a greenhouse

What I learned about potatoes:

  • Potatoes need temperatures between 60 (ideal) and 70 F, moist soil (too wet and they rot, too dry and they die), and 6 to 8 hours of sunlight a day.
  • They also need to be hilled, which is easy to do with a container/bag.
  • The potato's cycle is not tied to season or day length, they will just sprout after 6 months (their dormancy period).
  • They can be hilled with soil, straw or leaves - soil and leaves seem to be the most successful methods.
  • 1 seed potato can produce between 2 and 5 pounds of potatoes.
  • Americans eat about 142 lbs of potatoes per year - that's roughy 1 potato per day.
  • There are roughly 3 types of potatoes: early harvesting (70 to 80 days), mid-season harvesting (100 days) and late harvesting (120+ days). I think only the late-harvesting are adequate for long-term storage, but was unable to find any solid info on that (see note at the end).
  • Early-harvesting potatoes produce smaller crops than late-harvesting.
  • In any kind of potato, "new" potatoes can be harvested after approx. 60 days. Bottom potatoes can be harvested in the mid-season. And the entire crop can be harvested when the vine dries out.
  • Soil used to grow potatoes should not be re-used for potatoes for 2 to 4 years - we'd have to rotate it.

Ok, so we know we can't grow potatoes outdoors because we usually don't have a long enough spring - between last frost and summer heat. So the only hope is to grow them in the greenhouse in the fall and late winter. Several people have successfully done this (see below). The only requirements are to provide the right temperature and control pests (which is a requirement for any greenhouse crop).

eHow says: "Growing potatoes in a greenhouse is virtually no different from growing the tuber out of doors. Potatoes require sufficient soil, a constant temperature of around 60 degrees Fahrenheit, and water about twice a week. Greenhouses are necessary for those who live in severely cold climates, because potatoes will not grow through frost. Keep the windows closed at all times, except for on particularly sunny days to allow for ventilation. You can grow potatoes either in pots or beds inside of a greenhouse to produce a large, starchy harvest perfect for homemade fries or mash."

The Horticultural Channel plants potatoes in containers in August for Christmas harvest. Greta, who has a solarium kept at 70 F, starts one crop in January - for Spring harvest - and another in August - for Christmas harvest. She says "Growing potatoes in the greenhouse is fun and they do not require much care. Early potatoes started in January or February will have a late spring crop. Another planting done in August will have a harvest for Christmas Day."

Here's a discussion - on a survivalist's board - about growing potatoes in a greenhouse. One person says they grow potatoes year round - at first in the basement with grow lights and now in a greenhouse:

"We live in Southern Wisconsin and grow potatoes all year long. Now we do it in the green house but we use to grow them on ourbasment. It's really easy.

Take at least a 30 gallon garbage can and drill some holes in the bottom of it. Fill it 1/3 of the way up with dirt and then put your seed potato slices on it. Then cover the seed potatoes with about an inch of dirt over the top of them. If you want to plant more than one kind of potato use a different garbage can for each kind. In our basement we used a $10.00 Walmart plant light over each garbage can, had them on timers for 12-14 hours a day. Then when the sprouts get to be about 6 inches high, cover them halfway with dirt. Continue to do that until the grow over the top of the garbage can, then mound straw over them and stop watering them. When the tops turn yellow, put a tarp next to the garbage can to catch the dirt and dump it over. Collect your potatoes and put the dirt somewhere where you will not grow tomatoes or potatoes with it for at least two years. Bleach the garbage can and leave it out in the sun for a month or so and it's ready to be used again. We have a system set up where we plant potatoes every 2 to 3 months this way. It's so easy.

If you are growing them in your green house make certain it stays well above freezing in there because potatoes don't tolerate frost. If they do die back though make certain you harvest the potatoes that did grow. They will be baby potatoes and won't last long in storage but they can be eaten right away."

The Modern Homestead says they have great success planting potatoes in a greenhouse in the late winter (which would solve the problem of the short spring): "In my experience, root crops such as beets or carrots, even though cold hardy, are also not suitable for planting in the fall greenhouse—they will grow, but do not receive sufficient energy in the shortening days to “make root.” I have, however, had excellent results growing carrots, beets, potatoes, and daikon (as well as the smaller radishes) in the late winter greenhouse, harvesting these crops up to two months earlier than their siblings in the garden." Several other articles mention planting potatoes in a greenhouse in January for Spring harvest.

The SFGate says "Fall Planting - As the weather cools, the season becomes perfect for planting baby carrots, lettuces and potatoes for winter harvesting. Potatoes are more successful in a heated greenhouse. Position the plants where they can take advantage of the waning fall sunlight. Using deeper containers provides more water and nutrients to your crops, which will improve them and make them easier to grow."

Off-the-Grid News says potatoes are ideal vegetables to grow in a greenhouse in the winter months.

The Royal Horticultural Society (of the UK) also says you can grow potatoes in a greenhouse during the winter: "The taste of tiny, tender new potatoes need not be restricted to summer. With a little bit of skill and good timing, they can also be grown for autumn and winter harvests, meaning you could enjoy them at Christmas."

There is one thing I'm still confused about. The consensus is that late-harvesting potatoes (planted in the spring/summer and harvested in the fall) will last 6 months in storage (a potato's dormant period). For this to happen, the skin of the potatoes needs to thicken before they're harvested - and this usually happens when temperatures drop to 45 F. It's unclear what happens with greenhouse grown potatoes. It might be the case that they're always "new" potatoes - the skin never thickens. I think this would be fine if we eat them as we pick them - rather than waiting to harvest all at the same time. But I did find an article that says you can "force" the skins to thicken by cutting the top growth and then waiting a couple weeks before harvesting.

Thu Feb 26, 2015

Sat Jan 17, 2014

Sat Jun 7, 2014

Chrow.jpg

Mon April 7, 2014

  • Left message at Jamesport Lumber asking for contacts of contractors in the area: 660-684-6404
  • Left message with two contractos recommended by Jamesport Lumber: Marvin Yoder - 660-772-3003; Jamesport Builders - 660-684-6931
  • Jamesport Hardware Store: Parton Hardware 210 S Broadway St., Jamesport MO 660-684-6418

Mon Mar 10, 2014

TO DO

  • Swimming Pool: check delivery date
  • Microhouse: order additional water heater, replace busted pipe, check and repair water leak.
  • Solar Cabins: clean, paint, floor, whack weeds + lay straw.

Spring Residency

Design work in the morning, infrastructure work in the afternoon.

Sat Mar 8, 2014

LA Wishlist and Requirements

Fri Mar 7, 2014

Vertical Garden Materials Suppliers

Plants

  • Sedum Master - Located in Canada, ships to US. Regular mat (17 varieties): $3.5 sq ft. Feather mat (lightweight): $4 - $4.50 sq ft. Mats not appropriate for walls (drainage and nutrients problems). Custom grow: need estimate. They also sell sedum in 4 inch pots.
  • Plant Delights Nursery (North Carolina) - $11 for 3.5 in pot of John Creech sedum.
  • Monrovia (California) - $14.99 for .65 Gallon of John Creech sedum
  • Digging Dog (California) - $7.5 for 6-9 in. pot of John Creech sedum (not clear if this is the correct pot size)
  • Succulent Gardens
  • Oikos - $68.75 for 25 plants in pots (2.75)

Structures

Sedum

For vertical gardens (short):

For horizontal gardens (taller):

  • Ogon (3-6 in) - zones 6 to 9
  • Tricolor (4-6 in) - zones 2 to 9
  • Palmeri (8 in) - 15 to 20 F (but it has been known to survive in 0F)
  • Tetractinum (up to 6 in) - zones 5 to 8
  • Sieboldii (6-12 in) - zones 3 to 9


My favorite variety: Sedum Spurium John Creech: "A very low mat-forming selection, this Stonecrop has rounded deep green leaves and small clusters of pink star-shaped flowers in the summer. Tolerates light foot traffic. Full sun / partial shade. Mauve / pink flower. 2-4 in. (5-10 cm). Zone 2-9." Some sources say it's deciduous, others that it's evergreen (?).

Sedum has shallow roots and easily propagates from cuttings - they'll take root within 7 to 10 days.

We could purchase a few specimens and use those to propagate a sedum horizontal garden - which we'd then use to get cuttings for the vertical gardens.

Vertical Garden Models

Vertical Gardening Systems

Living Pictures

Shallow wood box filled with soil and covered with galvanized mesh. Appropriate for succulents. This is probably the approach we want.

Challenges

  • Size: We may need to make several of these and tile them as in this example (plywood and mahogany frame, root barrier behind soil behind landscape fabric held in with wire). We can also make our own large tray (a wood grid) rather than individual boxes - but individual boxes may be more manageable (can be removed more easily). Victoria Gardens built wall-sized panels which appear to use burlap in between the wire mesh and the soil (more Victoria Gardens photos) - they probably have wood shelves behind the burlap.
  • Water flow/drainage: make holes at the bottom of each tray?
  • Weight: will the wall withstand the weight? Perhaps use bookshelf approach where most weight rests on the ground and picture hanging hooks keep flush to the wall (may require a row of bricks below the bottom tray).

Pallet

Not appropriate for succulents.

Vertical or Angled Pockets

Not appropriate for succulents.

Trays

Plastic trays with individual vertical compartments. Appropriate for succulents.

Thu Mar 6, 2014

FeF Improvements List

HabLab To Dos for this Week

  • Check water / install pipeline if needed
  • Clear rubble outside
  • Lay straw in front of the house
  • Clean room for Chris
  • Hang storage area curtain
  • Finish cleaning fridge
  • Wipe front door
  • Wash sheets
  • Wash vacuum filters
  • Install new water heater
  • Weld chimney
  • Close old chimney hole
  • Insulate new chimney hole

MicroHouse To Dos for next Week

  • Internet
  • Cell phone signal booster
  • Fridge
  • Repair water leak
  • Stucco south and east walls

Whitewash Recipes

Mother Earth News
Fiasco Farm
Homemade DIY Paint
Yahoo
How to Whitewash Furniture

BoM

  • Hydrated lime [550]
  • Salt
  • 5 gallon paint buckets
  • Coating brushes [551]

Mon Mar 3, 2014

FeF Requirements for Year-round Operation

HabLab

  • Insulate bathroom/kitchen wall
  • Robust water heater
  • Sufficient heating for common room, kitchen, bathroom and bedrooms
  • Finish interiors (paint walls/floor, close holes, finish ceiling, etc)
  • Mud room (physically separate from main room)
  • Covered porch/patio
  • Outdoors and indoors firewood racks
  • Finish exterior rooms
  • Robust plumbing
  • Robust water system
  • Robust electrical system
  • Robust internet
  • Cell phone signal amplifier

Exterior

  • Gravel or wood chip paths connecting all buildings - for both pedestrians and vehicles
  • A way to shovel/clear snow-covered paths
  • Solar lights or reflective cells along the paths

MicroHouse

  • Draft insulation
  • Permanent (buried) water system
  • Permanent sewage system
  • Permanent electrical system (30A)
  • Internet connection
  • Cell phone signal amplifier
  • Two additional modules (bedroom + living/working room)
  • Heating on all modules
  • Covered porch/patio
  • Outdoors firewood rack

Workshop

  • Second stove

House Painting

I think the best contrast colors for dark brown walls are white, yellow and apple green. See for example:

http://blog.styleestate.com/storage/thumbnails/2908662-2950705-thumbnail.jpg?__SQUARESPACE_CACHEVERSION=1243374071765

http://www.colourlovers.com/palette/844425/Da_Lime_inda_Coconut

Menards doesn't have any bright greens (only boring ones), but Home Depot does have one that looks pretty nice (bamboo leaf). So here's the palette I suggest:

Inline image 3

Links for the paints at Home Depot:

Bamboo Leaf (green): http://www.homedepot.com/s/Bamboo%2520Leaf%2520%2520paint?NCNI-5

Lemon Lime (yellow): http://www.homedepot.com/s/lemon%2520lime%2520paint?NCNI-5

Chalkboard Paint: http://www.homedepot.com/s/chalkboard%2520paint?NCNI-5

For the MH I think we should go with white for the walls as that will make the space appear bigger.

Fri Jan 16, 2014

edit

Looked into Swimming Pool idea for morale management.