Jasonshah log

From Open Source Ecology
Jump to: navigation, search

Fri June6, 2014

  • Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press.

Thurs June 5, 2014

  • Ongoing work on the Google presentation on the instructional of the Secondary Cylinder Assembly, CEB 6 Press.
  • Swarmed with the summer team in the organization efforts at the Workshop.
  • Learned about the use of angle grinders and welding operations. Welded wheels to create a mobile steel worktable inside the workshop.
  • Assisted in moving materials for the raised beds infront of Hablab.

Wed June 4, 2014

  • Started the work on instructional for the Secondary Cylinder Assembly of the CEB 6 Press

File:CEB 6 Press Sec Cylinder Assembly.fcstd

  • Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision.

Tues June 3, 2014

  • Learned about several functions for operation of FreeCAD.
  • Coordinated the workshop area for access to Power Machines and Hydraulics units.
  • Worked with a group to assemble the CEB 6 Press; partial assembly accomplished but confusion with the general outlay of the machine.

Mon June 2, 2014

  • Morning session: Learning about features in the OSE Collaboration Architecture
  • Build session: Built a 4' * 8' prototype for a panel. Used 2" * 4" wooden beams and screws. These panels can be used for walls, decks. For info go to, chrisc_log
  • Assisted in the Agricultural Plantout

June 1, 2014

  • Arrived on Factor e Farm Campus. Orientation with the summer team.