Leo Log

From Open Source Ecology
Jump to: navigation, search

Saturday, August 3, 2013

Synced up with John.

TODO:

Familiarize myself with John's log and what others are working on with the HydraFabber.

Thursday, August 1, 2013

Updated the File:Spindle Mount.skp model with appropriate components and groups.

Saturday, July 27, 2013

Synced up with John and Marcin.

TODO:

  • Take Spindle Mount file and group appropriately
  • Right click part > convert to component
  • The explosion of the spindle

NOTE: Need to create another mount for the Laser.

Friday, July 12, 2013

Made the File:Spindle Mount.skp model in Sketchup.

Thursday, July 11, 2013

Talked with Ilam who pointed me to the Solid Works eDrawings where I opened the models and found all the measurements:

Top hole

  • Holds DC Motor with OD = 1.083"
  • Flush with the bottom of the Motor

Middle hole

  • Holds the top part of the Bronze Bushing with OD = 5/8"
  • 1.181" below the Top Hole part

Bottom hole

  • Holds the bottom part of the Bronze Bushing (^OD = 5/8")
  • 1.102" below the Middle hole part

The center of all 3 holes are .866" from the back of the mount. The width of the mount is 1.339" (or 39mm). The width of each piece is .236" (or 6mm).

TODO: Build model in Sketchup

Sat, July 6, 2013

Building the spindle mount.

  • OD of flexible spider: 5/8"
  • OD of bushing: 5/8"
  • OD of rigid coupler: 1/2"
  • Length of flexible spider: ??
  • Length of bushing: 1 1/2"
  • Length of rigid coupler: ??

TODO: Need to contact Ilan (or McMaster and SDP/SI) to get specs

Sat, June 29, 2013

Found parts for the Spindle drawing from MIT


TODO: Build a Sketchup model for the mount using the dimensions from the parts.

Sat, May 18, 2013

Working on quick connect tool mount for HydraFabber. *Please coordinate between John Log, Leo Log, Tim Log, and Nate Log - all work related to HydraFabber.