Archives for 2013

You are browsing the site archives by date.

The 6-in-60 Report, the New CEB Press, and a Call for DPVs

Summing Up the 6-in-60 The 6-in-60 Production Report video is as close as you can get to the 6-in-60 Campaign without your safety glasses. And it’s one to share. Watch as the Open Source Ecology team, including Dedicated Project Visitors (DPVs)  and...

HydraFabber Technical Update: Laser Cutter Design for Review, CNC Circuit Mill Ready for Build

Open Source Ecology’s HydraFabber, now in development, is a foldable, portable combination 3D printer, CNC circuit mill, and laser cutter. Its purposes will be to enable 2D and 3D rapid prototyping for open source machine design and to mill circuits...

Progress on the MicroHouse

MicroHouse Construction Manager Chris Reinhart is moving forward on the OSE Microhouse design. The Microhouse is a modular, low-cost, simple-but-comfortable, Compressed Earth Brick (CEB) house design. It is designed such that the different parts of the...

6-in-60 Video Update and Optimizing the Development Process

For an exciting taste of the action at Open Source Ecology’s HabLab, follow the ups and downs of the 6-in-60 Campaign in our no-holds-barred video update, part one. Watch Dedicated Project Visitors (DPVs) from Berea College help us to take new OSE...

Lifetrac 5 Tractor Delivered, DPV Updates

This week the LifeTrac 5 Tractor was shipped to New Orleans. With the build of this most recent LifeTrac design complete, we are in the process of setting up LifeTrac 5 on GrabCAD, an Open Engineering platform. Meanwhile, development of the documentation...

Lifetrac 5 Ready to Roll, Microhouse Coming Soon

Download LifeTrac 5 CAD files and documentation here. When filmmaker Ian Midgley went in search of world changers, he found Open Source Ecology and Our School at Blair Grocery. And then he imagined what could happen when two different visionary projects...

The Spark Update, OSE Car Ready for Review, and Much More

OSE is Teaming up with The Spark Documentary Team and with Our School at Blair Grocery to Produce a Tractor in One Day Preparations for The Spark tractor build are in full swing. On Sunday, filmmaker Ian Midgley and his film crew arrived, and Monday marked...

6-in-60 Machine Builds Under Way

With the machine builds of the 6 in 60 campaign now in full swing, exciting work at OSE continues. Days start at 9:00 a.m. and end at midnight, but Product Lead Gary DeMercurio reports,  “Everyone has been churning out tasks with great attitudes....

Video Documentation as It’s Never Been Done Before: An Invitation

Rob Kirk here. I’m Open Source Ecology’s documentation manager, and I’d like to fill you in regarding our innovative, collaborative approach to creating documentation. More than that, I’d like to invite you to consider becoming...

All Aboard! The 6 in 60 Campaign Continues

Let’s kick off this Tuesday update with a quick word from Marcin, OSE’s Executive Director: As our Operations Manager Katie Whitman joins us officially this week, we are excited to say that OSE 2.0’s core staff is now all on board, even as the 6...