It’s Over Our Heads
The roof is coming into place quickly. We will have the entire structure closed off – including a living roof covered with soil and straw – hopefully by today. Through major catastrophe – a part of the wall collapsing because the bricks...
CEB Foundation and Trusses Complete
from 2008. We have finished laying gravel and insulation for the CEB addition foundation. It is a shallow insulated foundation, made with 2″ extruded polystyrene insulation going down 18 inches, plus 1 inch gravel as the fill. There is a drainage...