02013

DPV Experience July 15th-TBD

Week 31:July 28-Aug 3

  • Tue/30
1030-1045:Communicated with Rob and John B about using the complete machine SketcUp files for the purpose of documentation and development of the infographics.
0100:Contacted Gary/Katie/Audrey about implementing the format I am using for my log as a standard DPV log template/A template for the entire year can be generated on a sample page to be copied and pasted to a new DPV's log to enable more uniform/consistent log entries and documentation by DPVs
  • Mon/29
0900-1200:Cont'd VSM of Development Process and Implementation Plan
1200-1230:Lunch
1230-1500:Cont'd VSM of Development Process and Implementation Plan
1500-1700:Communicated with Jean-Baptiste Vervaeck about colaborating/contributing to development of infographics via messaging/hangout
1700-1800:Research DIY recycled glass foaming process for hydroponic substrate using crushed glass, foaming agent, high temp oven
  • Sun/28
Day off

Week 30:July 21-July 27

  • Sat/27
Day off
  • Fri/26
1030-1130:Assisted in preparing for Process planning meeting by working to better lighting conditions for webcam/troubleshooting technical webcam issues with Audrey/
1130-1400:Value Stream Mapping(VSM) of LT5 Current State
1400-1430:Lunch
1430-1530:Cont'd VSM of LT5 Current State
1900-0000:VSM/SG Process research
  • Thu/25
0930-1200:Romoved remaining items from shelves in SE corner of workshop
1200-1230:Lunch
1230-1300:Cleaned/removed all spilled hydraulic oil from shelves in SE corner of workshop
1300-1500:Began process of methodically returning items to shelves
1500-1530:Brought HabLab construction materials from wnew workshop to old workshop
1530-1600:Swept S/SE areas of workshop
2000-2300:Conducted refresher research on Stage Gate(SG)Process formalities
  • Wed/24
0930-1030:Organized PPE area in workshop
1030-1200:Cleaned/organized NW corner of workshop
1200-1230:Lunch
1230-1330:Cleaned ironworker,mill,large metal table
1330-1730:Removed/organized items on shelves in SE corner of workshop
1730-1800:Moved backhoe and fork attachment to old workshop with Lucas via lifetrac
1800-1830:Moved garbage bin to street
  • Tue/23
1500:Departed for Maysville,MO
2300:Arrived at FeF
  • Mon/22
Errands/Networking in Milwaukee,WI
  • Sun/21
1200-1330:Systematically placed kitchenware, cutlery, countertop appliances into kitchen
1330-1430:Sorted througha all food items and disposed/composted old items
1430-1500:Labeled kitchen storage/sleves accordingly
1500-1530:Prepared for brief return trip to Milwaukee,WI
1530:Departed for Milwaukee,WI

Week 29:July 14-July 20

  • Sat/20
0800-0900:Completed sterilizing scrub of kitchen floor/ John Stager joined initiative and provided several buckets of clean water as needed during scrubbing process
0900-1000:Purchased tung oil from Maysville with Lucas W
1100-1200:Applied tung oil to upper cabinets/realized tung oil is bad on particle board of lower cabinet interiors to prevent mold
1200-1230:Lunch
1230-1530:Went to Cameron to purchase polyurathane spray for lower cabinets and replacement kitchen faucet
1530-1600:Applied polyurethane spray to interior of lower cabinets
1600-1630:Ventilated house of aerosol from spraying dur to lack of ventilation in HabLab
1630-2300:Rest/enjoyed evening
2300-2330:Applied 2nd coat of tung oil to upper cabinets
  • Fri/19
0900-1200:Observed repairs of hydraulic leak/field test of LT5
1200-1230:Lunch
1230-1330:Observed first attempt to load LT5 on trailer/observed it almost falling off trailer due to wrong tyoe of hydraulic cylinder for articulating steering/observed successful to recovery to try loading again
1330-1500:Rest/troubleshoot solutions
1500-1700:Other DPVS and Onsite contributers succesfully troubleshot loading problem by switching hoses to enable more controlled steering onto trailer and they loaded LT5 onto trailer
1700-1730:LT5 DPV team, Spark documentary team, and contributing DPV photo with LT5
1730-1800:LT5 departure
1800-2030:Voluntarily conducted individual deep clean of entire bathroom to include showers, toilets, sink area, plastic storage drawers, and vacuumed
2030-2330:Voluntarily initiated kitchen deep clean by removing EVERYTHING from the kitchen/Vacuumed mouse feces from shelf above kitchen entrance/Lucas Warner eagerly joined and began to wash all of the dirty dishses that have accumulated/I pulled out fridge and began sterilzing scrub of floor/We decided to remove shelf from behind fridge that was going unused and taking valuable space/Lucas grabbed power tools and removed shelf for dutting and cut it while I sterilized all surfaces to include all cabinets and insides surfaces of all lower cabinets/contents of lower cabinets included very old kambucha, mold, cockraoches, large bad of old harvested walnuts/ reinstalled shelving with Lucas and returned fridge/Lucas and I removed/sorted/disposed accordingly of all items in fridge and cleaned inside of it/Swept floor
  • Thu/18
0900-0930:Morning meeting/discussed tasks to complete the LifeTrac 5(LT5) fabrication
0930-1200:Worked on fabricating LT5
1200-1230:Lunch
1230-2200:Completed fabricating the LT5, Fabricated/used die 7/16-20 die to thread new jowstick for LT5, had to grind down diameter of recycled joystick
  • Wed/17
0900-0930:Morning meeting/discussed tasks to be completed with the LifeTrac 5(LT5) fabrication
0930-1130:Worked on fabricating LT5
1130-1200:Lunch
1200-1400:rest
1400-2200:Continued working on fabricating LT5
  • Tue/16
0900-0930:Morning meeting/discussed tasks to be completed with the LifeTrac 5(LT5) fabrication
0930-1230:Worked on fabricating LT5
1230-1300:Lunch
1300-2100:Continued Working on fabricating LT5
  • Mon/15
0830-Arrived at FeF
0900-0930:Morning meeting/discussed tasks to be completed with the LifeTrac 5(LT5) fabrication that was currently in Progress
0930-1200:Worked on fabricating LT5
1200-1230:Lunch
1230-2200:Continued working on LT5 fabrication