Minimum Workable Feature of XM Process Design

From Open Source Ecology
Jump to: navigation, search

All development exists on component level

3 Roles for Team:

  • Scrum Master is Team Host and Gopher
  • Product Owner is vision
  • Team does the work

See Scrum Master Standard

Begin

Rad

  1. Buy or get donated an industry standard machines
  1. Definition of Ready
  2. Set up Scrumy project
  3. Set up XM Project Page
  4. Daily development log
  5. Daily Vlog
  6. Specification and design rationale
  7. Conceptual design diagram
  8. Machine functional process diagram
  9. CAD
  10. Fabrication Drawings
  11. Fabrication Review
  12. Tooling requirements defined
  13. BOM
  14. Sourcing information
  15. Master Fabrication PDF
  16. CAM files
  17. CAE
  18. RP - rapid prototyping
  19. Bench Prototype
  20. SEBD
  21. Control Code
  22. Code
  23. Circuit Diagram
  24. Exploded Part Diagram
  25. Test procedure defined
  26. Test procedure performed
  27. Daily Vlog
  28. Daily Log
  29. Scaling Calculations
  30. Working prototype
  31. Budget
  32. Contract First Manufacturing (Interface Design)
  33. Rapid Prototype done via RP Strategy
  34. Recruit SME designer
  35. Recruit SME prototyper
  36. Integration into machine
  37. SME XM Proposal Brief from developer
  38. Video footage of build

Strategic Review

  1. Sourcing strategy
  2. Sourcing review
  3. BOM review
  4. DfF (Design for Fabrication) review
  5. Fabrication review
  6. Video documentation strategy
  7. Product ecology review
  8. Team strategy
  9. Team review - who should be on the team?
  10. Integration logistics defined
  11. Modularity Review
  12. Lean review - process

Integration

  1. Fabrication optimization strategy defined and documented
  2. Cnx.org upgrade
  3. Integration into machine
  4. Regression testing (integrated machine testing)
  5. Product ecology testing (test with other machines)
  6. Pairing of team members
  7. Cross training
  8. Video editing

]]