File list

Jump to: navigation, search

This special page shows all uploaded files.

File list
 
Date Name Thumbnail Size Description
22:52, 5 July 2012 Bricks and Ceiling Interface.jpg (file) 675 KB Bricks need to be removed from the top row to permit ceiling installation.
22:49, 5 July 2012 Ceiling Gaps.jpg (file) 687 KB Ceiling Panels should not have these gaps, they should be properly aligned to create a tight seal.
22:11, 5 July 2012 Interior Earth Plaster.jpg (file) 892 KB Matt applied 5 SF Earth Plaster to the interior of the HabLab
19:19, 5 July 2012 Requisition TurboShears.pdf (file) 47 KB Requesting acquisition of turbo shears at factor e farm
20:30, 4 July 2012 Graham Hauls Hay.jpg (file) 847 KB Graham hauls a haybale towards the HabLab for ceiling insulation. 2012-07-04.
20:27, 4 July 2012 Brianna and the Greeks.jpg (file) 667 KB Brianna instructs the Greeks on installing power infrastructure in the HabLab before the daily scrum at 1200. 2012-07-04.
20:24, 4 July 2012 Matt Trims Beam.jpg (file) 663 KB Matt trims a beam to allow the ceiling panels to slide into place under the rafters in the East rooms of the HabLab. 2012-07-04
20:22, 4 July 2012 Free range chicks.jpg (file) 1,003 KB the baby chicks at factor e farm enjoy much freedom. 2012-07-04.
20:19, 4 July 2012 Sawmill overgrown.jpg (file) 1,001 KB The Sawmill area needs to have its weeds knocked down. 2012-07-04.
20:17, 4 July 2012 Cats Breakfast.jpg (file) 590 KB The cat left me a rabbit for breakfast. 2012-07-04.
04:09, 4 July 2012 Grahams Foot Injury.jpg (file) 676 KB Although Will was unable to extract the remnants of a thorn from Graham's foot, Graham used the last of his bentonite as an ointment, which is apparently a magic clay and has many medicinal and other uses.
04:05, 4 July 2012 Gabi Communes with GoodCow.jpg (file) 1.02 MB Gabi and GoodCow share a moment, this is GoodCow's first day at Factor e Farm 2012-07-02.
03:42, 4 July 2012 Graham Stuffs Ceiling Straw.jpg (file) 600 KB Graham handles straw while stuffing the ceiling with local organic insulation. 2012-07-03
03:39, 4 July 2012 Graham and Nassus Install Ceiling.jpg (file) 709 KB Graham and Nassus are in the process of installing metal ceiling panels on the HabLab. 2012-07-03.
03:35, 4 July 2012 Graham Uses Sawzall.jpg (file) 689 KB Graham uses Sawzall to create a penetration in the purlin through which the power cord can pass.
03:32, 4 July 2012 Graham Trims Sheet Metal.jpg (file) 820 KB Graham trims some sheet metal to be installed in the HabLab ceiling.
03:29, 4 July 2012 Plastic ceiling liner.jpg (file) 624 KB Graham stands underneath the plastic ceiling liner during the staple-installation process.
03:20, 4 July 2012 IPhone June 2012 034.jpg (file) 663 KB HabLab East Ceiling Install in progress.
04:35, 2 July 2012 Buildingmaterials.jpg (file) 654 KB list of building materials already on site, including sheet metal, lexan, windows, carpet, and felt board.
04:33, 2 July 2012 Roomonedoorandwindowframe.jpg (file) 700 KB sketches of door and window framing in place and list of sizes of available windows.
04:30, 2 July 2012 Roomoneplanandprofile.jpg (file) 681 KB plan and profile for room one of hablab east build-out.
17:16, 6 June 2012 Matt Schwabauer Intro.wmv (file) 14.02 MB Matt Schwabauer's Video Introduction
02:53, 30 May 2012 Matt Schwabauer Resume.pdf (file) 66 KB slight formatting modifications